A new catalog of a 3d bathroom floor and epoxy flooring design, see the modern 3d flooring ideas and 3d bathroom floors the UK, self-leveling floors for bathroom tiling ideas, Decorative Self Leveling Floor and how to laying of self-leveling floors and 3d floor in the bathroom.
3d floors are one of the unique and contemporary flooring ideas for bathroom office and all interiors, I have provided one of 3d floor art and murals you can see it Full Catalog of 3d floor art and self-leveling floors.
3D bathroom floor murals and designs :
By making the 3d bathroom floor, the polymer blend composition in the required proportions so as to obtain a homogeneous mass. Next, using a doctor blade distribute it on the base. Then roll coating with a spiked roller to expel air bubbles. Dries like covering about 5/6 days. Do not let this period of direct sunlight on the surface of the flooring, otherwise, the coating may dry unevenly.
If you want to supplement the glamor gloss finished 3d floors, then apply a polymer lacquer finish.
What is the 3d floor?
Not so long ago we had the opportunity to use new technologies in arranging the floors in the bathroom. It's about 3D technology. If before the ceramic tile was the pinnacle of our dreams, now designers offer us new, bold and relevant solutions for methods of repairing premises, in particular, bathrooms.
At the heart of the 3D floor is several layers. The last of which is the photo image. In order to create the appearance of a three-dimensional image on such a floor, you need to look at a certain angle. 3D floor with a volume effect makes any room unusual, fabulous and exclusive.
The technique of three-dimensional drawing was borrowed from artists who write their canvases on asphalt. The drawings amaze our imagination with its naturalness and vivacity. Masters embody all their wildest ideas in these pictures and immerse us in the world of dreams and fantasies.
At first, spectacular linoleum was presented to the buyers, with the advent of polymeric materials, 3D epoxy flooring was announced loudly about its right to exist. In terms of wear resistance, they are superior to ceramics, artificial stone, and laminate.
The bulk floor is inherently polymeric transparent composition used everywhere.
The time came when polymer floors “met” with 3d technology and this was in some way a revolution in the world of interior design. Many people are delighted with the fact that they have a three-dimensional realistic image under their feet.
We all know that when limitless freedoms open up to a person, it is very difficult for him to curb his imagination. In this case, the main thing is that a tasteless canvas is not born. The advice of knowledgeable people - in this matter you need to be extremely careful.
The basis of the colorless coating of these floors is a two-component composition. First, a base is applied on the floor, then a colored film is laid on it. The next step is another layer of polymer.
How to make a 3D bathroom floor with your own
The process consists of several simple steps, consider the features of each of them.
From the bathroom, you need to remove all the furniture, remove the baseboards and remove the old flooring. The base must be thoroughly vacuumed, removing all dust and small debris.
If the old floor screed in the bathroom is in good condition and there is a waterproofing under it, then it is enough to prepare it for applying a 3D bulk coating. To do this, you need to make sure that it is flat, check with the help of its horizontal level. If there are protrusions, use a punch to remove them. Cracks must be sealed with mortar. Before installing the 3D floor surface should be sanded, after which it should be vacuumed.
In case of serious destruction of the base or dampness of the floor, you must re-do the tie. Under it should be laid waterproofing, for which it is undesirable to use a film. We recommend processing in several layers with mastic of bitumen floors and walls 15 cm from the base.
Carefully cover up the need and places around the pipes. After drying, waterproofing is required to pour the prepared solution to create a screed. After a few days, the floor must be sanded with a nozzle and vacuumed. Further work can begin no earlier than 1 month.
The tool should be distributed by roller over the entire area of the floor. In this case, the formation of lumps of the mixture should not be allowed; it should lie in an absolutely even layer. By applying the second layer of primer should begin when the first layer is completely dry. You can continue to work after drying the second layer, which may take about 5 hours.
Carefully cover up the need and places around the pipes. After drying, waterproofing is required to pour the prepared solution to create a screed. After a few days, the floor must be sanded with a nozzle and vacuumed. Further work can begin no earlier than 1 month.
The tool should be distributed by roller over the entire area of the floor. In this case, the formation of lumps of the mixture should not be allowed; it should lie in an absolutely even layer. By applying the second layer of primer should begin when the first layer is completely dry. You can continue to work after drying the second layer, which may take about 5 hours.
Strictly according to the manufacturer’s instructions indicated on the package, it is necessary to prepare the polymer mixture solution using a construction mixer. Then the composition needs to be poured in the corner of the bathroom farthest from the entrance.
Needle roller vigorously distributes the resin on the floor. It quickly hardens, which must be considered during operation. As a result, the polymer layer should evenly cover the surface and there should be no voids and air bubbles in it.
Small details of the decor should begin to lay out on the base layer before it is completely dry. For the formation of the pattern, you will need to put on the paint booths. When distributing the decor on the surface, avoid pushing objects. If it is planned to use a print on a film as an image, then it is necessary to wait for the base to dry, which will take about 7 days. The film must be laid out on the floor surface, and then, carefully removing the protective paper from the wrong side, pasted on the base. Then it should be smoothed with a roller.
Before laying the fabric print it is necessary to apply the final layer of the mixture. From above it is necessary to spread a cloth and to level in the direction from the middle to edges. The fabric that falls on the areas around the pipes, you need to carefully cut.
After the print is laid out on the surface, a new epoxy solution should be prepared, which should be poured over the floor surface. The method similar to applying the base layer, it is necessary to distribute the mixture with a needle roller.
Next, you will need to wait for the final drying of the coating, which may take up to 3 weeks. The frozen surface must be polished and cleaned of dust. Top coating is permissible to protect the layer of colorless varnish. After the drying of the latter, it will be possible to return the furniture and bathroom fixtures to their places and start using the bathroom.
Advantages and disadvantages of 3d epoxy floor
3D epoxy floors have the following advantages:
- One of the main characteristics is the non-toxicity of the 3D floor.
- They are quite durable, reliable and not subject to abrasion.
- On this monolithic coating, there are no joints, from which it is impossible to get rid of, laying the usual floor covering.
- The 3D floor is not slippery, but for a room where the humidity is high and there is always the likelihood of water on the floor - this is of great importance.
- Smoothness.
- In a room with such a floor, the interior looks modern and unusual.
- The design of the floors depends only on the imagination of the owners of the house and on their financial possibilities.
- The improved performance of the 3D floor makes it an excellent alternative to the classic types of flooring.
- There is no dust on such floors.
- They do not pass water, so 3D floors are used in bathrooms.
- The material is not flammable, it is highly flammable. It does not remain stains from acids and alkalis.
- The polymer compositions that make up this floor are hypoallergenic.
3D epoxy floors have the following disadvantages:
The high cost of installation and the 3D coating.
The polymer coating dries for a long time (6 - 7 days).
Independently dismantle such a floor is quite difficult.
3D floor requires special care. To clean it is best to use a special machine and detergents. Only with such care will the floor remain transparent and not lose its original shine.
To perform work on the installation of such a floor at a high-quality level can only a good master.
3D floors in interiors of various styles
The bulk floor will look great in an expensive country cottage, and in an ordinary small apartment. Compatibility with different styles will depend on the choice of pattern or methods of the decoration of the coating.
If strict classics, Baroque, Rococo, Empire, classical solutions are more suitable, hand-painted, playing with light and shadow, then for modern rooms, high-tech, minimalism, and constructivism it is possible to choose a very bright and modern solution.
Thanks to the variety of materials and the choice of photo illustrations, you can refresh and make any interior unique. Create an atmosphere of bright and very distinctive autumn, using real maple and oak leaves for decoration.
Constructibility of the bathroom will help to give contrasting photos with geometric notes. Interestingly in this quality looks macro photography of flowers and plants, water droplets, rain, and dew.